Walsh Jesuit High School WAP Project

16
Jan

Walsh Jesuit High School WAP Project

Description of Work This project included the installation of a Wireless Access Point System for Walsh Jesuit High School. Our Scope of Work was to: Install (98) single cat-6 plenum cable user outlets and (98) WAP units, all cat-6 cables for WAP locations will originate from nearest IDF closet’s on 1st and 2nd floors and …

16
Jan

University Hospitals – Ahuja Medical Center Closet Build-Out and Cable Installation

Description of Work This project provided the installation of the University Hospitals Ahuja Medical Center BP-17A Technology project including Closet Build-Out and Backbone Cable Installation. Our Scope of Work Included: Closet Build-out: Build-out fourteen (14) Tele data closets, according to UH specifications (section 17100, 17101 and Technology Enlarged Rooms sheet T3.01 to T3.05). Backbone Cable …

15
Jan

Huntington National Bank – 200 Public Square Relocation

Description of Work Project installation for the Huntington National Bank Downtown Corporate office relocation included the following: Horizontal category-6 plenum cable system, MDF/ IDF Room build-out, Backbone & Demarc extension cable system. As-built drawings, test results for cables installed, support certifications and warranty documentation was also included in the delivery of provided services. Our Scope …

15
Jan

Horseshoe Casino – Telecom Closet Build-Out

Description of Work Build-out (7) Telecom closets for Security, MDF- Main Distribution Frame and IDF- Intermediate Distribution Frames for others to install & terminate Horizontal and Backbone cabling. Our Scope of Work was to: Build-out (1) Security room with 2 tier overhead ladder rack, 2-post & 4-post relay racks, vertical wire managers and Server cabinets. …

15
Jan

Horseshoe Casino – Level 143 Horizontal Cabling

Description of Work Install Level 143 Voice/Data cabling for South Phase 2.5, installation is for Casino Management support staff and equipment. Our Scope of Work was to: Install, terminate, label and test (30) triple category-6 user outlets, with (2) locations un- terminated with 20’ service coil’s, (2) coax RG6 TV outlets and (1) CCTV outlet. …

15
Jan

Horseshoe Casino – Speaker System

Description of Work Speaker system installation and cabling for all common and entertainment area’s for casino. Our Scope of Work Included: Level 75 Area A: Install (116) ceiling speakers, tile bridges and cable installed by others. Level 75 Area B: Install (34) ceiling speakers, tile bridges and cable installed by others. Level 85: Install (178) …

15
Jan

Horseshoe Casino – DAS Cabling

Description of Work Install (1) Distribution Antenna System “DAS” cabling for interior cell phone service coverage for casino. Our Scope of Work was to: Install backbone cabling: (1) 48-strand Single-Mode armored fiber, (1) 72-strand Single-Mode armored fiber and (1) 25 pair category-3 cable and (7) category-6 cables un-terminated for SoundCom to terminate, label and test. …

15
Jan

Horseshoe Casino – Level 75 Horizontal Cabling

Description of Work Terminate and test existing horizontal; cabling installed by otehrs for Level 75 Food Court area. Our Scope of Work was to: Terminate, faceplate and label (227) existing category-6 cable user outlets. Terminate (227) category-6 cables at IDF closet’s TR007 & TR108 on 48-port category-6 patch panels. Test and certify (227) category-6 cables …

15
Jan

Huntington National Bank – Media Wall

Description of Work This project provided Huntington National Bank with a state of the art 2×2 Media Wall at its Pittsburgh, PA main office.  Media wall functions will give HNB display of marketing material, login remote PC from head-end and quest lap top connection from conference room table. Our Scope of Work was to: Install …

15
Jan

Eaton World Headquarters Cabling Project

Description of Work Install Telecommunications Package for Eaton World Headquarters for Entry Pavilion, Parking Garage and Wellness Center located in Beachwood, Ohio. Our Scope of Work was Complete: Entry Pavilion Install (2) eight jack cat-6 double gang user outlets. Install (1) 24-port patch panel frame and grounding/ bonding system to GND bar & data racks …