We “MACimize” the value of Telecommunications!

[email protected] | 440-735-1932

Case Western Reserve University Projects

CWRU – Moves, Adds, and Changes for School of Medicine Institute of Pathology

Description of Work Mac Installation & Consulting installed one (1) Mark 3 faceplate for the School of Medicine Institute of Pathology Building, Room 115. Our Scope of Work Included: Base bid-Room 115: Install one (1) Mark 3 faceplate with three (3) cat-6 cables for  one (1) voice/ two (2) data, one (1) 2-strand MM fiber …

CWRU – Moves, Adds, and Changes for Media Vision

Description of Work Mac Installation & Consulting,  provided CWRU with the installation of thirty (30) category-5e data cables for the School of Medicine Building Media Vision Department cabling project. Our Scope of Work Included: Area Office 60C, 60P, 60D, 60L, 60K, 60E, 60F, 60W, 60G and 60H: Install ten (10) triple cat-5e data user outlets, …

CWRU – Moves, Adds and Changes for Adelbert Gym

Description of Work Mac Installation & Consulting provided CWRU with one (1) new weather proof network outlet at Adelbert gym for a new power inverter. Our Scope of Work Included: Install ¾” EMT from server room to a location outside for data cable. Install one (1) cat 5e cable through a small weather proof box …

CWRU – Alumni House Upgrade Cabling Project

Description of Work The installation of  ninety (101) Category-6 350Mhz data cables to existing network faceplates in Alumni House. Our Scope of Work was to: Install one (1) Category-6 350Mhz cable to each faceplate using existing raceway to ninty (101) existing network faceplates. Install one (1) 1-port surface mount box to existing MARK 1 handy …

CWRU – Moves, Adds, and Changes for Kelvin Smith Library

Description of Work Mac Installation & Consulting provided two (2) 72-strand single-mode fiber optic cable at Kelvin Smith Library IT closets Our Scope of Work was to: Install one (1) PVC inner duct from Server rooms 188-00 to 188-01. Install two (2) riser rated 72-strand single-mode fiber cables in new inner duct. Terminate (288) strands …

CWRU – Fraternity Houses Upgrade Cabling Project

Description of Work Performed SOW to provide upgrade network cabling solution for Fraternity Houses Our Scope of Work Included: Closet build-out: fourteen (14) 48-port cat-5E patch panels and fourteen (14) front/back horizontal wire managers. One (1) cat-5E horizontal cable to each Dorm room, six hundred and thirty-four (634) total. One (1) MARK V faceplate assembly …

Recent Articles

Smart Speaker Market – the Rising Demand of Low Voltage and Medium Voltage Electrical System in the Construction & Automotive Industry

Rise in the adoption of cable lugs in the construction industry due to its capabilities of guaranteeing a very safe and long lasting connection is acting as a major growth driver for the cable lugs market. Therefore, the growing need of adoption and integration of solid, stranded and fine stranded copper conductors in the current …

Global Market Study on Power Cable: Low Voltage Handling Power Cables Projected to Gain Significant Market Share During 2018 – 2026

Power cables are mainly used for power transmission and distribution purpose. It is an assembly of one or more individually insulated electrical conductors, usually held together with an overall sheath. Read the full report: https://www.reportlinker.com/p05429852 The assembly is used for transmission and distribution of electrical power. Electrical power cables may be installed as permanent wiring within …

Horseshoe Casino – Level 75 Horizontal Cabling

Description of Work Terminate and test existing horizontal; cabling installed by otehrs for Level 75 Food Court area. Our Scope of Work was to: Terminate, faceplate and label (227) existing category-6 cable user outlets. Terminate (227) category-6 cables at IDF closet’s TR007 & TR108 on 48-port category-6 patch panels. Test and certify (227) category-6 cables …

Eaton World Headquarters Cabling Project

Description of Work Install Telecommunications Package for Eaton World Headquarters for Entry Pavilion, Parking Garage and Wellness Center located in Beachwood, Ohio. Our Scope of Work was Complete: Entry Pavilion Install (2) eight jack cat-6 double gang user outlets. Install (1) 24-port patch panel frame and grounding/ bonding system to GND bar & data racks …

CCF South Pointe Hospital – Nurse Call System Upgrade

Description of Work Mac Installation & Consulting, Teamed with SoundCom Systems and provided the installation of a new Responder 5 Nurse Call System for CCF South Pointe Hospital located in Warrensville, Ohio. Our Scope of Work was to: Hospital area’s covered: Ground Radiology, Ground Emergency Department, 2nd Floor O.R. Area, 2nd floor Recovery Area, 2nd …

︿
Contact Us

Contact Us

Send us a message and one of our customer service representatives will contact you within 24 hours.

Contact ×
Contact Us
Email Click-to-call 440-735-1932

Contact Us

×
Name(Required)