CWRU – Moves, Adds, and Changes for Media Vision

Description of Work Mac Installation & Consulting,  provided CWRU with the installation of thirty (30) category-5e data cables for the School of Medicine Building Media Vision Department cabling project. Our Scope of Work Included: Area Office 60C, 60P, 60D, 60L, 60K, 60E, 60F, 60W, 60G and 60H: Install ten (10) triple cat-5e data user outlets, …

15
Jan

CWRU – Moves, Adds and Changes for Adelbert Gym

Description of Work Mac Installation & Consulting provided CWRU with one (1) new weather proof network outlet at Adelbert gym for a new power inverter. Our Scope of Work Included: Install ¾” EMT from server room to a location outside for data cable. Install one (1) cat 5e cable through a small weather proof box …

15
Jan

CWRU – Alumni House Upgrade Cabling Project

Description of Work The installation of  ninety (101) Category-6 350Mhz data cables to existing network faceplates in Alumni House. Our Scope of Work was to: Install one (1) Category-6 350Mhz cable to each faceplate using existing raceway to ninty (101) existing network faceplates. Install one (1) 1-port surface mount box to existing MARK 1 handy …

15
Jan

CWRU – Moves, Adds, and Changes for Kelvin Smith Library

Description of Work Mac Installation & Consulting provided two (2) 72-strand single-mode fiber optic cable at Kelvin Smith Library IT closets Our Scope of Work was to: Install one (1) PVC inner duct from Server rooms 188-00 to 188-01. Install two (2) riser rated 72-strand single-mode fiber cables in new inner duct. Terminate (288) strands …

15
Jan

CWRU – Fraternity Houses Upgrade Cabling Project

Description of Work Performed SOW to provide upgrade network cabling solution for Fraternity Houses Our Scope of Work Included: Closet build-out: fourteen (14) 48-port cat-5E patch panels and fourteen (14) front/back horizontal wire managers. One (1) cat-5E horizontal cable to each Dorm room, six hundred and thirty-four (634) total. One (1) MARK V faceplate assembly …

15
Jan

Cabling and Closet Build-Out for Cleveland State University

Description of Work Installation of backbone cabling and closet build-out for CSU College of Education and Human Services project on the main campus. Our Scope of Work was to: Installation included the following: Closet Build-out of six (6) Telecommunication closets. Backbone cable installation to five (5) Telco closets includes SM & MM fiber, Inner duct …

15
Jan

CCF South Pointe Hospital – Nurse Call System Upgrade

Description of Work Mac Installation & Consulting, Teamed with SoundCom Systems and provided the installation of a new Responder 5 Nurse Call System for CCF South Pointe Hospital located in Warrensville, Ohio. Our Scope of Work was to: Hospital area’s covered: Ground Radiology, Ground Emergency Department, 2nd Floor O.R. Area, 2nd floor Recovery Area, 2nd …

15
Jan

Installing CCTV Fiber and Copper Cabling System – Fairview Hospital

Description of Work Install Intra-Building Fiber & Copper cabling for CCF Fairview Hospital ED and ICU Addition Our Scope of Work Included: Intra-Building fiber optic cabling (does not include distribution panels, splice tray, termination, labels or testing of fiber cables) installation only. SB-00 ER-02. 72 Strand SM/MM 50um Indoor/Outdoor and inner duct ER-02 to TR-ED-11. …

Page 2 of 2
︿
Contact Us

Contact Us

Send us a message and one of our customer service representatives will contact you within 24 hours.

Contact ×
Contact Us
Email Click-to-call 440-735-1932

Contact Us

×
Name(Required)