CWRU – Moves, Adds, and Changes for School of Medicine Institute of Pathology

Description of Work Mac Installation & Consulting installed one (1) Mark 3 faceplate for the School of Medicine Institute of Pathology Building, Room 115. Our Scope of Work Included: Base bid-Room 115: Install one (1) Mark 3 faceplate with three (3) cat-6 cables for  one (1) voice/ two (2) data, one (1) 2-strand MM fiber …

15
Jan

CWRU – Moves, Adds, and Changes for Media Vision

Description of Work Mac Installation & Consulting,  provided CWRU with the installation of thirty (30) category-5e data cables for the School of Medicine Building Media Vision Department cabling project. Our Scope of Work Included: Area Office 60C, 60P, 60D, 60L, 60K, 60E, 60F, 60W, 60G and 60H: Install ten (10) triple cat-5e data user outlets, …

15
Jan

CWRU – Moves, Adds and Changes for Adelbert Gym

Description of Work Mac Installation & Consulting provided CWRU with one (1) new weather proof network outlet at Adelbert gym for a new power inverter. Our Scope of Work Included: Install ¾” EMT from server room to a location outside for data cable. Install one (1) cat 5e cable through a small weather proof box …

15
Jan

CWRU – Alumni House Upgrade Cabling Project

Description of Work The installation of  ninety (101) Category-6 350Mhz data cables to existing network faceplates in Alumni House. Our Scope of Work was to: Install one (1) Category-6 350Mhz cable to each faceplate using existing raceway to ninty (101) existing network faceplates. Install one (1) 1-port surface mount box to existing MARK 1 handy …

15
Jan

CWRU – Moves, Adds, and Changes for Kelvin Smith Library

Description of Work Mac Installation & Consulting provided two (2) 72-strand single-mode fiber optic cable at Kelvin Smith Library IT closets Our Scope of Work was to: Install one (1) PVC inner duct from Server rooms 188-00 to 188-01. Install two (2) riser rated 72-strand single-mode fiber cables in new inner duct. Terminate (288) strands …

15
Jan

CWRU – Fraternity Houses Upgrade Cabling Project

Description of Work Performed SOW to provide upgrade network cabling solution for Fraternity Houses Our Scope of Work Included: Closet build-out: fourteen (14) 48-port cat-5E patch panels and fourteen (14) front/back horizontal wire managers. One (1) cat-5E horizontal cable to each Dorm room, six hundred and thirty-four (634) total. One (1) MARK V faceplate assembly …

︿