Horseshoe Casino – Telecom Closet Build-Out

Description of Work Build-out (7) Telecom closets for Security, MDF- Main Distribution Frame and IDF- Intermediate Distribution Frames for others to install & terminate Horizontal and Backbone cabling. Our Scope of Work was to: Build-out (1) Security room with 2 tier overhead ladder rack, 2-post & 4-post relay racks, vertical wire managers and Server cabinets. …

15
Jan

Horseshoe Casino – Level 143 Horizontal Cabling

Description of Work Install Level 143 Voice/Data cabling for South Phase 2.5, installation is for Casino Management support staff and equipment. Our Scope of Work was to: Install, terminate, label and test (30) triple category-6 user outlets, with (2) locations un- terminated with 20’ service coil’s, (2) coax RG6 TV outlets and (1) CCTV outlet. …

15
Jan

Installing CCTV Fiber and Copper Cabling System – Fairview Hospital

Description of Work Install Intra-Building Fiber & Copper cabling for CCF Fairview Hospital ED and ICU Addition Our Scope of Work Included: Intra-Building fiber optic cabling (does not include distribution panels, splice tray, termination, labels or testing of fiber cables) installation only. SB-00 ER-02. 72 Strand SM/MM 50um Indoor/Outdoor and inner duct ER-02 to TR-ED-11. …

︿