Eaton World Headquarters Cabling Project

Description of Work Install Telecommunications Package for Eaton World Headquarters for Entry Pavilion, Parking Garage and Wellness Center located in Beachwood, Ohio. Our Scope of Work was Complete: Entry Pavilion Install (2) eight jack cat-6 double gang user outlets. Install (1) 24-port patch panel frame and grounding/ bonding system to GND bar & data racks …

15
Jan

CWRU – Moves, Adds, and Changes for School of Medicine Institute of Pathology

Description of Work Mac Installation & Consulting installed one (1) Mark 3 faceplate for the School of Medicine Institute of Pathology Building, Room 115. Our Scope of Work Included: Base bid-Room 115: Install one (1) Mark 3 faceplate with three (3) cat-6 cables for  one (1) voice/ two (2) data, one (1) 2-strand MM fiber …

15
Jan

CWRU – Moves, Adds, and Changes for Media Vision

Description of Work Mac Installation & Consulting,  provided CWRU with the installation of thirty (30) category-5e data cables for the School of Medicine Building Media Vision Department cabling project. Our Scope of Work Included: Area Office 60C, 60P, 60D, 60L, 60K, 60E, 60F, 60W, 60G and 60H: Install ten (10) triple cat-5e data user outlets, …

15
Jan

CWRU – Moves, Adds and Changes for Adelbert Gym

Description of Work Mac Installation & Consulting provided CWRU with one (1) new weather proof network outlet at Adelbert gym for a new power inverter. Our Scope of Work Included: Install ¾” EMT from server room to a location outside for data cable. Install one (1) cat 5e cable through a small weather proof box …

15
Jan

CWRU – Alumni House Upgrade Cabling Project

Description of Work The installation of  ninety (101) Category-6 350Mhz data cables to existing network faceplates in Alumni House. Our Scope of Work was to: Install one (1) Category-6 350Mhz cable to each faceplate using existing raceway to ninty (101) existing network faceplates. Install one (1) 1-port surface mount box to existing MARK 1 handy …

15
Jan

CWRU – Moves, Adds, and Changes for Kelvin Smith Library

Description of Work Mac Installation & Consulting provided two (2) 72-strand single-mode fiber optic cable at Kelvin Smith Library IT closets Our Scope of Work was to: Install one (1) PVC inner duct from Server rooms 188-00 to 188-01. Install two (2) riser rated 72-strand single-mode fiber cables in new inner duct. Terminate (288) strands …

15
Jan

CWRU – Fraternity Houses Upgrade Cabling Project

Description of Work Performed SOW to provide upgrade network cabling solution for Fraternity Houses Our Scope of Work Included: Closet build-out: fourteen (14) 48-port cat-5E patch panels and fourteen (14) front/back horizontal wire managers. One (1) cat-5E horizontal cable to each Dorm room, six hundred and thirty-four (634) total. One (1) MARK V faceplate assembly …

15
Jan

Cabling and Closet Build-Out for Cleveland State University

Description of Work Installation of backbone cabling and closet build-out for CSU College of Education and Human Services project on the main campus. Our Scope of Work was to: Installation included the following: Closet Build-out of six (6) Telecommunication closets. Backbone cable installation to five (5) Telco closets includes SM & MM fiber, Inner duct …

15
Jan

Installing CCTV Fiber and Copper Cabling System – Fairview Hospital

Description of Work Install Intra-Building Fiber & Copper cabling for CCF Fairview Hospital ED and ICU Addition Our Scope of Work Included: Intra-Building fiber optic cabling (does not include distribution panels, splice tray, termination, labels or testing of fiber cables) installation only. SB-00 ER-02. 72 Strand SM/MM 50um Indoor/Outdoor and inner duct ER-02 to TR-ED-11. …