CWRU – Moves, Adds and Changes for Adelbert Gym

CWRU – Moves, Adds and Changes for Adelbert Gym
15
Jan

Description of Work

Mac Installation & Consulting provided CWRU with one (1) new weather proof network outlet at Adelbert gym for a new power inverter.

Our Scope of Work Included:

  1. Install ¾” EMT from server room to a location outside for data cable.
  2. Install one (1) cat 5e cable through a small weather proof box on the wall with a 5’ weather proof whip to be extended into the inverter cabinet.
  3. All cables will be installed and supported in accordance with EIA/TIA standards for low voltage communications wiring.  Faceplate/ surface boxes and patch panels will be labeled with machine generated labels. All fire wall and floor penetrations will be sleeved with EMT conduit and fire stopped according to building code. Printed test results available after project completion.
︿
Contact Us

Contact Us

Send us a message and one of our customer service representatives will contact you within 24 hours.

Contact ×
Contact Us
Email Click-to-call 440-735-1932

Contact Us

×
Name(Required)