15
Jan
Description of Work
Install Telecommunications Package for Eaton World Headquarters for Entry Pavilion, Parking Garage and Wellness Center located in Beachwood, Ohio.
Our Scope of Work was Complete:
Entry Pavilion
- Install (2) eight jack cat-6 double gang user outlets.
- Install (1) 24-port patch panel frame and grounding/ bonding system to GND bar & data racks provided by others.
Parking Garage
- Install (8) dual cat-6 user outlets.
- Build-out (1) Telco closet with 18” Wyr-Grid cable tray system, (2) 24-port patch panel frames, (2) 4u horizontal wire mangers, (2) vertical wire managers and ground/bonding system to GND bar & data rack provided by others.
Wellness Center
- Install (19) dual cat-6 user outlets, (5) cat-6 wall phone outlets, (2) WAP outlets and (28) Exercise Machine outlets.
- Build-out (1) Telco closet with 18” Wyr-Grid cable tray system, (2) 48-port patch panel frames, (3) 4u horizontal wire mangers, (3) vertical wire managers and grounding/bonding system to GND bar & data racks provided by others.
Patch cords
- Provide (1,242) Panduit 10’ & (8,280) 5’ cat-6 patch cords.
- Provide (250) LC-LC SM 3 meter & (250) LC-LC SM 5 meter simplex fiber jumpers.
- Provide (250) LC-LC 50 micron laser opt MM 3 meter & (250) LC-LC 50 micron laser opt MM 5 meter simplex fiber jumpers.