Description of Work
Project installation for the Huntington National Bank Downtown Corporate office relocation included the following: Horizontal category-6 plenum cable system, MDF/ IDF Room build-out, Backbone & Demarc extension cable system. As-built drawings, test results for cables installed, support certifications and warranty documentation was also included in the delivery of provided services.
Our Scope of Work Included:
User outlet configuration
Office locations (88): Single user outlets wired with one (1) Systimax Spring Green category-6 plenum cable, terminated on one (1) Systimax Grey category-6 8-position RJ45 modular jack, installed in one (1) Systimax White 1-port flush mount faceplate. Also, includes one (1) Systimax Spring Green 1’ & 10’ category-6 patch cords.
Cube/ Drop locations (235): Single user outlets wired with one (1) Systimax Spring Green category-6 plenum cable, terminated on one (1) Systimax Grey category-6 8-position RJ45 modular jack, installed in one (1) Systimax White 1-port furniture faceplate or 1-port flush mount faceplate. Also, includes one (1) Systimax Spring Green 1’ & 10’ category-6 patch cords.
Conference Room locations (43): Single user outlets wired with one (1) Systimax Spring Green category-6 plenum cable, terminated on one (1) Systimax Grey category-6 8-position RJ45 modular jack, installed in one (1) Systimax White 1-port flush mount faceplate. Also, includes one (1) Systimax Spring Green 1’ & 10’ category-6 patch cords.
Miscellaneous locations (67): Single user outlets wired with one (1) Systimax Spring Green category-6 plenum cable, terminated on one (1) Systimax Grey category-6 8-position RJ45 modular jack, installed in one (1) Systimax White 1-port flush mount faceplate. Also, includes one (1) Systimax Spring Green 1’ & 10’ category-6 patch cords.
Huddle locations (12): Single user outlets wired with one (1) Systimax Spring Green category-6 plenum cable, terminated on one (1) Systimax Grey category-6 8-position RJ45 modular jack, installed in one (1) Systimax White 1-port flush mount faceplate. Also, includes one (1) Systimax Spring Green 1’ & 10’ category-6 patch cords.
MDF/ IDF room build-out
MDF/ IDF rooms: CPI (Chatsworth) Black 2-post pedestal relay rack, Systimax 48-port category-6 patch panel (quantity based on horizontal cable total per IDF room), CPI Black 18” ladder rack, CPI Black 18” relay rack mounting plate, CPI Black 18” wall angle bracket and bonding & grounding system.
Backbone & DMARC cabling system
Install one (1) 1 ¼”” Carlon plenum inner duct from the 7th floor MDF room 7006 to: the 2nd, 6th, 7th and 11th floors. IDF rooms: 2nd floor room 205, 6th floor rooms 6013, 6122, 7th floor rooms 7102, 7131, 11th floor room 1118.
Furnish and install one (1) Corning 12-strand 50 micron fiber from the 7th MDF room to each of the above IDF rooms. Fiber will be terminated with Corning LC connectors.